These Bus Converters connect CENTUM VP Human
Interface Stations (HISes) on the Vnet/IP to CENTUM
VP/CENTUM CS 3000/CENTUM CS stations on the V
net, CENTUM CS 1000 stations on the VL net in other
domain.
To connect to CENTUM CS 3000/CENTUM CS
System, VP6H4450 Multiple Project Connection
Package and VP6E5450 Multiple Project Connection
Builder are required. To connect to CENTUM CS
1000 System, an Ethernet, as well as these packages,
is also required.
n STANDARD SPECIFICATIONS
For the installation speciffcations and environmental
conditions that are common to the systems, refer to the
GS “Integrated Production Control System CENTUM
VP System Overview" (GS 33J01A10-01EN).
Communication on the Vnet/IP Side
Communication Speed: 100 Mbps, Full Duplex
Connection: UTP cable (CAT5e or better),
RJ45 connector
Interface: 100Base-TX compliance
Max. distance: 100 m (Distance between AVR10D
and Layer 2 switch)
Communication on the V net Side
Communication Speed: 10 Mbps
Connection: Coaxial cable, BNC type
Dual-redundant or single
For CENTUM VP, CENTUM CS 3000 and CENTUM
CS
Communication on the VL net Side
Communication Speed: 10 Mbps
Connection: Coaxial cable, BNC type
Dual-redundant or single
For CENTUM CS 1000
Conffguration
Nest
Mounting
19-inch Rack Mounting:
Rack mount (4 x M5 screws)
Insulation bush (accessory)
Connection
Power Supply: M4 screw terminal connection
Grounding: M4 screw terminal connection
Contact Output: M4 screw terminal connection
V net and VL net Side: T-junction BNC connection
Vnet/IP Side: UTP cable (CAT5e or better)
Power Supply
(Specify with Sufffx Code)
Voltage: 100-120 V AC, Frequency: 50/60 Hz
Voltage: 220-240 V AC, Frequency: 50/60 Hz
Voltage: 24 V DC
Power Consumption
100-120 V AC: 80 VA
220-240 V AC: 110 VA
24 V DC: 1.7 A
Power supply method dual-line or single power line
Weight
Approx. 5.8 kg
Model AVR10D
Duplexed V net Router
Yokogawa Electric Corporation
2-9-32, Nakacho, Musashino-shi, Tokyo, 180-8750 Japan
Tel.: 81-422-52-5634 Fax.: 81-422-52-9802
GS 33J50D10-01EN
GS 33J50D10-01EN
©Copyright Feb. 2015 (YK)
1st Edition Feb. 1, 2015 (YK)
F01E.ai
2
All Rights Reserved. Copyright © 2015, Yokogawa Electric Corporation
Hole for mounting on a 19-inch rack
(4 holes for M5 screws)
169
18.4
8.75
21.3
482.6
465.1
440
132.5
150.6
18.4 Unit: mm
37.7
57.1
Note: The above drawings are for AVR10D-20.
Nominal Tolerances :
When the reference dimension is over 0.5 mm and equal or less than 120 mm, its nominal tolerance is ± 0.8 mm, while its
combination of nominal tolerance is ± 1.5 mm.
When the reference dimension is over 120 mm, its nominal tolerance is in accordance with JEM 1459.
n REQUIREMENTS FOR USING SEM (SEQUENCE OF EVENTS MANAGER)
To use SEM for Vnet/IP, ffrmware revision of VI451 should be R6 or later. (Firmware revision No. is indicated under
“F” on the revision sticker on the component)
For details, refer to “SEM Sequence of Events Manager (for Vnet/IP and FIO)” (GS 33K30D10-50E).